11 Oct 2016

More pillar work

Continued with the left side pillar. Patched the top of the pillar and repaired the upper door hinge mounting area.
 Fitting the next patch on the top of the pillar.
Same patch welded and grinded.
Next patch to the door hinge mounting area.
 Just welded..

No comments:

Post a Comment